INDEXGetting Started
|
USE THE RadPad© and 'WORKSHEET' to complete the system sizing. 10. Total Tube Required The spacing between tubes and the amount of heated floor area you will cover determine the total tube required. Multiply the "spacing factor" printed on the back of the RadPad© above the TUBE SPACING window, by the Heated Floor Area. The result will be the total tube required.
Tip: remember to use only the floor area which will be heated and contribute to warming the space.
|
||||||||
---|---|---|---|---|---|---|---|---|---|